Prepare a project requirements matrix, a risk assessment matrix, and a cost breakdown for the Learning Team project selected in Wk 2. Microsoft Excel can be used to prepare these documents.

Collect and evaluate the high-level project requirements.

Prepare a requirements matrix that includes:

  • Requirement
  • Phases of the project
  • Responsible party
  • Cost to complete
  • Duration to complete

Prepare a risk assessment matrix that includes:

  • Risk
  • Potential of risk occurring
  • Level of impact to the project
  • How risk can be mitigated

Prepare the project cost breakdown sheet.

Testimonials

Wk 3 Team – Project Requirements/Risk/Cost Paper
We have updated our contact contact information. Text Us Or WhatsApp Us+1-(309) 295-6991