Abstract In this paper we discuss a real-life case study to optimize the logisticsnetwork for the collection of containers from end-of-life vehicle dismantlers in theNetherlands. Advanced planning concepts, such as dynamic assignment of dis-mantlers to logistic service providers, are analyzed using a simulation model.Based on this model, we periodically solve a vehicle routing problem to gaininsight into the long-term performance of the system. The vehicle routing problemconsidered is a multi-depot pickup and delivery problem with alternative deliverylocations. A special characteristic of the problem is the limited vehicle capacity oftwo containers. We solve this problem with a heuristic based on route generationand set partitioning.

Keywords Reverse logistics . Closed-loop supply chain management . Vehiclerouting . Set partitioning . Distribution planning

1 Introduction

Concern for the environment has led to EU legislation for the recovery of discardedproducts. The original equipment manufacturer (OEM), as the creator of the prod-ucts, is responsible for and pays for the reverse chain activities. Extended ProducerResponsibility (EPR) is the starting point for all EU legislation on end-of-life waste(Spicer and Johnson 2004). EPR extends the responsibility of the producer to coverthe entire life cycle, including end-of-life disposal. The way EPR is implemented isleft to the member states. In this paper we will address a case involving containers

The authors would like to thank Roelof Reinsma and Annemieke van Burik of Auto RecyclingNederland for their assistance and support during the project. Furthermore, we thank the twoanonymous referees for their valuable comments on the manuscript.

H. M. le Blanc (*) . M. van Krieken . H. Krikke . H. FleurenCentER Applied Research, Tilburg University, P.O. Box 90153,5000 LE Tilburg, The NetherlandsE-mail: [email protected], [email protected], [email protected], [email protected]

OR Spectrum 28:53–71 (2006)

used by the national Dutch auto recycling system. Based on this case, we willanalyze new route planning concepts that are based on central planning.

1.1 Developments in end-of-life vehicle recycling

The automotive industry is one of the major European industries confronted with amassive number of end-of-life products. A total of 14.2 million passenger cars weresold in Europe in 2003, all of which will be discarded at some time. With theapproaching deadline for implementation of the European directive on the re-cycling of end-of-life vehicles (Directive 2000/53/EC), many EU member statesare taking initiatives in this direction (ACEA 2004). EU legislation prescribes arecovery target of at least 85% of each car, 80% of which through reuse andrecycling by 2006. In some EU member states, national legislation is even stricter.

In the Netherlands, the national representatives of the automotive industry,including all car manufacturers, joined hands with the founding of Auto RecyclingNederland (ARN). ARN is responsible for the funding and the physical operationsentailed in implementing the national legislation on EPR for its members. In theterms of Spicer and Johnson (2004), ARN is a producer responsibility organi-zation. Under the authority of ARN, certain materials are dismantled at the col-lection points for separate recovery; administration and reporting are essential.Krikke et al. (2004) describe this type of reverse supply chain as a “control-type.”These “control-type” supply chains assure that recovery is carried out in ac-cordance with formal requirements by reporting mass-balances, showing the rela-tionship between input, output and the degree of recovery. The costs of the logisticnetwork for collection, consolidation, disposition and transport of these materialsare high. Pressure from the market, together with the harmonization of nationallegislations, will hopefully lead to more efficiency in the “control-type” reversesupply chains.

1.2 Outline of the paper

The aim of the present study is to quantify the expected benefits of new advancedplanning concepts for the logistic network for containers of Auto RecyclingNederland. The problem and its real-life setting will be discussed in Section 2. Wewill limit this presentation to the part of the recycling network involving con-tainers. In Section 3 we will discuss literature relating to the problem at hand.Vehicle routing literature describing similar problems is scarce. On account of theparticular characteristics of the problem, we needed to develop a new heuristic.This heuristic is described in Section 4. In Section 5, the results of the case studyare discussed. These results incorporate sensitivity analysis and analysis of alter-native scenarios. Finally, in Section 6, the results are summarized and suggestionsfor further research are given.

The various aspects of end-of-life vehicle recycling will not be described here;the interested reader is referred to Püchert et al. (1994) for a discussion of thebusiness aspects of ELV recycling and for more details on the Dutch system ofARN to Van Burik (1998) and Le Blanc et al. (2004).

54 H. M. le Blanc et al.

2 Problem description and background

2.1 Case study

The case study deals with optimizing the collection of containers that are used totransport end-of-life materials from dismantled vehicles. Due to pressures fromthe market, the ARN system will need to further improve the reverse chain for theprocessing of end-of-life vehicles (ELVs). As chain director, ARN outsources theactual processes to existing ELV-dismantlers, shredder companies, recyclers andlogistic service providers (LSPs). The LSPs are contracted for a period of threeyears and are responsible for the logistics activities in a certain province. Theiractivities include the transportation of the containers to a depot, consolidation at thedepot, in some cases value-adding activities such as sorting and finally transpor-tation to the recycling company. The current logistic planning activities are decen-tralized and performed by the individually contracted LSPs. LSPs are assigned toELV-dismantlers on the basis of province boundaries. In a central planning sce-nario, transportation orders are not sent directly to the individual LSPs, but col-lected on a centralized level and assigned in clusters to the LSPs, making use of thecost benefits of combining orders. Allocation of ELV-dismantlers to LSPs is nolonger fixed, but adjusted regularly based on the optimization of routes on a centrallevel. Cruijssen and Salomon (2004) call this the principle of transportation ordersharing and find savings up to 15% in an empirical study, depending on thecharacteristics of the network. In the literature, this concept is referred to as fourthparty logistics (4PL), representing an entity outside the organization that assemblesand integrates third-party capabilities to achieve transformational efficiencies notattainable by the organization on its own (Bumstead and Cannons 2002).

In this paper, we consider manually dismantled, high-volume materials storedand collected in containers. Table 1 gives an overview. An ELV-dismantler who hasa full container submits a request for collection to the logistic service provider(LSP). Within five working days, the LSP visits the dismantler and exchanges thefull container for an empty one. Glass, rubber strips and PU-foam are collected in acompartmented container, specially designed for ARN. Tires and bumpers arecollected in 35m3 containers for all ELV-dismantlers. Currently, all materials arebrought to the depot. Here, all materials, except tires, are sorted and processed andthen transferred by bulk transport to recyclers, mostly located in neighboringcountries. Since tires need no processing at the depot and the four contractedrecycling companies are located in the Netherlands, they can be sent directly to

Table 1 The materials collected in containers with their applications after recycling

Material Average amount per wreck Application of the recovered material

Tires 27.9 kg High quality: retreaded and sold as tireLow quality: paving tiles and insulation mats

Bumpers 5.6 kg Engine covers and wheel archesGlass 25.4 kg Bottles and glass fiberPU-foam 6.7 kg Car seat padding and mattressesRubber strips 7.7 kg High purity: as roll container wheels

Low purity: as fuel in cement kilns

Vehicle routing concepts in the closed-loop container network of ARN—a case study 55

recyclers, bypassing the depot. In our computational experiments, we examinethe cost benefit of this option. We focus on the planning of requests from ELV-dismantlers to have containers collected. Since the recyclers of materials other thantires are located abroad, transport of these materials to the recyclers usually takesthe form of a linehaul trip. Linehaul trips offer no combination possibilities and thecosts of these trips are assumed to be fixed. Figure 1 gives an overview of theprocesses in the ARN network.

Currently, LSPs use two types of lifting mechanisms for loading and unloadingcontainers onto a truck. The first system uses an iron chain to drag the container uponto the truck, while the second system uses a pneumatic hook to pickup thecontainer and place it on the truck. Although both systems work fine, they are notcompatible. A container or truck suitable for the hook system is not suitable for thechain system and vice versa. This restriction must be taken into account in planningthe trips, since LSPs do not have both lifting mechanisms, which leads to a com-plexity-reducing separable structure. Figure 2 shows the map of the Netherlandswith province boundaries and the lifting mechanism in use (hook or chain). We feelthat standardization of the lifting mechanism would be an improvement.

The goal of the study is to analyze and improve the system of collectingcontainers. To this end, we examine the following situations:

– Allowing direct shipment of containers from dismantler to recycler, bypassingthe consolidation depot.

– Changing the allocation of dismantlers to LSPs from the current assignment,based on province boundaries, to optimal fixed assignment or to dynamic as-signment based on optimal routing decisions in each planning period.

– Standardizing the lifting mechanism for loading and unloading containers onto atruck.

Although this is mainly a tactical study, we choose to solve the operationalproblem as well, to get a good estimate of transportation costs and performance.This is because the small nuances in different scenarios cannot be adequatelyexpressed in tactical models, hence the need for detailed operational routes. Theproblem resembles a unique multiple logistic service provider vehicle routingmodel with pickup and delivery allowing alternative delivery locations and withsmall vehicle capacity (two containers), which has not been described in the

Fig. 1 An overview of the processes in the ARN network for the recycling of ELVs

Consumer hands inELV for dismantling

Dismantling

ShredderCarcass

Material storage(container)

Depot for freightconsolidation

Materialrecycler

Collection within 5working days after

request

Materials

56 H. M. le Blanc et al.

literature before. We call this the 2-container collection problem. In the next sub-section we will give a formal description of the problem.

2.2 The 2-container collection problem

The 2-container routing problem consists of a set of ELV-dismantlers, a set ofdepots, owned by an LSP and a set of recyclers. Distance and travel times betweenall locations are known. Both ELV-dismantlers and depots can initiate transporta-tion orders for containers. At an ELV-dismantler, empty containers are exchangedfor full ones, while at a recycling facility full containers are exchanged for empty

Fig. 2 Overview of the ARN network indicating the two lifting mechanism (hook and chain) inuse per province

Vehicle routing concepts in the closed-loop container network of ARN—a case study 57

ones of the same type. Since a shortage of containers never occurs in practice in aclosed-loop system, the depot locations are assumed to have sufficient storage ofall container types to exchange. Orders may be for either one or two containers; allorders concern containers of the same type. Full containers coming from ELV-dismantlers can be delivered either to a depot or to a recycling facility; full con-tainers coming from a depot can only be delivered to a recycling facility. Whichdelivery location is selected depends on policy, practical restrictions, the estimatedgate fee for dropping the order at the location and the costs of including the deliverylocation in the route. The gate fee depends on the residual value of the product andcan even be negative, i.e. money is paid by the recycler to acquire the material.Figure 3 gives a conceptual mapping of the problem.

A vehicle’s route starts and ends at the depot. A route may take no longer thannine hours, one hour of which is overtime for a 50% higher rate. For each stop, afixed stopping time and a variable loading and unloading time are incurred. Thecosts of a route are composed of a distance and a time component. The modelallows for differentiating the kilometer and hourly rates per LSP. Vehicle capacityin the model is limited to two containers. Each LSP is deemed to have an unlimitednumber of vehicles. This is realistic since these types of trucks are widely used. Inthe next section we will explore relevant literature dealing with similar problems.

3 Literature

Literature on vehicle routing is abundant, (see Bodin et al. 1983; Toth and Vigo2002). In reverse supply chains, variants of the classical vehicle routing problemoccur that have been less extensively studied (Dethloff 2001). Beullens (2001)provides an excellent overview of vehicle routing models and the special types ofmodels occurring in reverse logistics.

The problem closest to the situation at hand is the skip problem (SP) as de-scribed in De Meulemeester et al. (1997). Vehicles start at a depot and have todeliver empty skips to customers, collect full skips from customers and deliver thefull skips to either the depot or one of the disposal facilities. A vehicle has the

ELV -dismantlers

DepotsRecyclers

All materialsexcept tires

Only tires

abroad

Recyclers inthe

NetherlandsVehicle capacity of 2

containers

Fig. 3 Conceptual overview of the collection problem

58 H. M. le Blanc et al.

capacity to carry one skip at a time. Skips can be of multiple types and this is arestriction in exchanging full for empty. De Meulemeester et al. (1997) develop twoheuristics and an exact procedure for solving this real-life problem. The exactprocedure is based on enumeration. The first heuristic is based on the classicalClarke and Wright savings heuristic. The second heuristic calculates a solution to aformulated transportation problem, providing a lower bound to the optimal solu-tion. The solution to the transportation problem is made feasible in a number ofheuristic steps. On average, the variant of the Clarke and Wright savings algorithmperformed best.

Bodin et al. (2000) describe a variant of the skip problem called the rollon-rolloff vehicle routing problem (RRVRP). In a RRVRP trip, a truck with a capacityfor one container departs from a depot to serve customers who need a containerplaced, collected or exchanged (full for empty). The network consists of only onedepot and one disposal facility and all containers are of the same type. In that sensethe model of Bodin et al. (2000) is a simplification of the real-life case of DeMeulemeester et al. (1997). Bodin et al. (2000) develop four types of algorithms.The first algorithm is again an adaptation of the Clarke and Wright heuristic. Thesecond algorithm is a trip insertion and trip improvement heuristic. The thirdalgorithm is a so-called decomposition algorithm, which starts by enumeratingroutes, followed by solving a set covering problem. The resulting solution isimproved with some swaps. The last and most advanced algorithm is a truncateddynamic programming heuristic, generating partial solutions that are completed byadding the not covered orders by solving a bin-packing model. The contribution ofBodin et al. (2000) is of a theoretical nature, since they only test the heuristics usinga set of randomly generated instances. The dynamic programming algorithm per-forms the best, although calculation times are long. The other algorithms are faster,but the trip insertion and trip improvement heuristics in particular are not com-petitive in terms of solution quality.

Archetti and Speranza (2004) describe another variant of the problem, the so-called 1-skip collection problem (1-SCP). As the name indicates, vehicle capacityis limited to one skip or container. Since Archetti and Speranza deal with a real-lifeproblem, they consider several practical restrictions such as multiple containertypes, time windows, different priorities for different customers and a limited fleetsize. Archetti and Speranza develop a three-phase algorithm. In phase 1, the set ofskips that needs to be collected that day is determined and ranked in priority. Inphase 2, a solution for the subset of skips is constructed. In phase 3, the solution isfurther improved by using local search procedures.

Although some of the models come close to the situation at hand, none of themhas the same characteristics. All of these models consider the vehicle capacity to belimited to precisely one skip or container instead of two as in our case. Extendingthe algorithms described in literature to the situation with two containers is nottrivial. Techniques known from more general vehicle routing models could beused; however, these techniques do not exploit the discrete capacity of only twocontainers. Hence, in this paper we develop a new heuristic for tackling the prob-lem at hand.

Vehicle routing concepts in the closed-loop container network of ARN—a case study 59

4 Description of the heuristic

The heuristic we developed to handle the case described is a two-step heuristic. Inthe first step a large number of candidate routes is generated. In the second step, acombination of routes is selected, minimizing the costs of drawing up a completeroute plan, while satisfying all the requirements. This combination of route gen-eration and set partitioning is referred to in vehicle routing literature as the setpartitioning approach, see for example Fleuren (1988). This type of algorithmswhere a promising set of possibilities is generated and a solution is found by setpartitioning is referred to as petal algorithms (Laporte et al. 2000). An alternativeway of applying set partitioning in this setting is by using column generation, seefor example Agarwal et al. (1989). Since we have a fast set partitioning solver atour disposal and our average number of orders per route is limited, we chose to doan enumeration of a large set of feasible routes. Figure 4 gives an overview of theheuristic.

4.1 Route generation

The purpose of route generation is to construct a set of feasible routes, such thatthe route selection procedure can make a “good” choice from the set. To tacklethis multi-depot pickup and delivery problem with alternative delivery locations,we introduce the concept of root-orders and sub-orders. This is described inSection 4.1.1.

While the number of feasible routes grows exponentially, we suffice with thegeneration of a promising subset of routes. To restrict the number of candidateroutes generated, we use the concept of order neighborhoods; this is the topic ofSection 4.1.2.

Finally, the route generation procedure is described in Section 4.1.3.

4.1.1 Root and sub-orders

To handle the pickup and delivery problem with alternative delivery locations andselection of logistic service providers, we distinguish root- and sub-orders. Everytransportation order has a general root-order with location- and LSP-specific sub-orders. Since each sub-order has a unique pickup and delivery location as well as alogistic service provider, our algorithm can proceed along the same lines as astandard pickup and delivery heuristic. However, we have to add some constraintsto ensure that only one sub-order is performed per root-order.

Fig. 4 The framework for the routing heuristic

Input(root-) orders

Determinesub-orders

Calculateneighborhood

sub-ordersRoute generation

Route selection(set partitioning)

Output routeschedule

Step 1 Step 2

60 H. M. le Blanc et al.

Example. ELV-dismantler WreckRec has a container of tires that needs to betransported either to the tire recycler TireRec or to a depot of a logistic serviceprovider. There are two competing logistic service providers with a depot: LogOptand LogCheap. This single root-order results in four sub-orders as shown inTable 2.

If a sub-order is selected with delivery to the depot, where delivery to therecycler was also an option, we have to correct the route costs for the futuretransportation costs from the depot to a recycler. In this situation, the sub-ordergenerates a new root-order in the next planning period for the transport to therecycler. Since planning periods are short, three working days, this heuristic step isnot a severe limitation. These costs are estimated using the Eq. [1].

CostCorso ¼ � � LHCso � Loadso (1)where:

α=Correction factor between 1/4 and 1LHCso=Linehaul costs to deliver a container from the depot of sub-order so to

the cheapest recycler in transportation costs and gate fee.Loadso=Number of containers in sub-order soThe correction factor α expresses the combination possibilities for the trans-

portation orders from depot to recycler. If α=1 no combinations are made and thefull linehaul costs are charged to collect a single container. The perfect combinationwould be two containers from the depot to the recycler and two containers from anELV-dismantler adjacent to the recycler back to the depot, which corresponds withα=1/4. In our implementation we use α=0.8, which follows from empirical anal-ysis in cooperation with ARN.

4.1.2 Neighborhoods

While the total number of feasible routes can be very large, up to several million,we use the concept of neighborhoods to limit the set of candidate routes. Everyorder has a set of neighbors, ordered on a distance-based criterion. When we addorders to a route, we only consider orders that are in the neighborhood of the route,which is the union of neighborhoods of the orders in the route.

Formally, we can describe this as follows. At the start of an empty route, everysub-order can be inserted. Since we develop a set of routes, each root-order canoccur on several routes. For each sub-order we define a set of neighboring sub-orders belonging to different root-orders. Let nb_subordso denote this set ofneighboring sub-orders for sub-order so. RouteSubOrdersr denotes the set of sub-

Table 2 The sub-orders in the example of WreckRec

Sub-order LSP performing the order Pickup location Delivery location

1 LogOpt WreckRec LogOpt depot2 LogOpt WreckRec TireRec3 LogCheap WreckRec LogCheap depot4 LogCheap WreckRec TireRec

Vehicle routing concepts in the closed-loop container network of ARN—a case study 61

orders in route r. The neighborhood of a route r, denoted as nb_router, is the unionof the neighborhoods of the sub-orders in a route, i.e. nb router ¼ [

so2RouteSubOrdrnb subordso:

To determine the neighborhood of a sub-order we need a distance measure. Thisis a heuristic step in the procedure. Consider two sub-orders so_A and so_B, withpso and dso denoting the respective pickup and the delivery location of sub-order so.Our distance measure is based on the best way to combine two orders rather thandrive them separately. Mathematically this criterion is given in [2].

distso A;so B ¼ min d pso A; dso Að Þ þ d dso A; pso Bð Þ þ d pso B; dso Bð Þ;fd pso A; pso Bð Þ þ d pso B; dso Að Þ þ d dso A; dso Bð Þ;d pso A; pso Bð Þ þ d pso B; dso Bð Þ þ d dso B; dso Að Þ;d pso B; dso Bð Þ þ d dso B; pso Að Þ þ d pso A; dso Að Þ;d pso B; pso Að Þ þ d pso A; dso Bð Þ þ d dso B; dso Að Þ;d pso B; pso Að Þ þ d pso A; dso Að Þ þ d dso A; dso Bð Þg�d pso A; dso Að Þ � d pso B; dso Bð Þ

For each sub-order, we list the distances to all suborders belonging to a differentroot-order and include the nearest nb_size sub-orders in nb_subordso. Experimentswith the required size of the neighborhood to find suitable solutions in acceptablecomputational time for the given study indicated that nb_size=6 performs well; wewill use this value in the rest of this paper. Figure 5 shows the diminishing im-provements found by extending the neighborhood size is shown for a represen-tative sample of 25 real-life instances consisting of an average of 54 root-orders and114 sub-orders. Further increasing the neighborhood size will marginally improvethe solution and cause a big increase in the route generation times. Note that abovea certain threshold the route generation is no longer restricted and all feasiblecombinations are generated.

(2)

Influence neighborhoodsize

90

92

94

96

98

100

1 2 3 4 5 6 7 8 9 100

20

40

60

80

100

Cost Route generation time

Co

st

ind

ex

Co

nm

pu

tin

g t

ime

ind

ex

Neighborhood size

Fig. 5 The influence of changing the size of the neighborhood on the quality of the solution basedon a representative sample of 25 real-life instances (computing time index 100=1498 s)

62 H. M. le Blanc et al.

4.1.3 Outline of the route generation algorithm

The aim of the route generator is to create a large number of attractive and feasibleroutes. As stated in Section 4.1.2, we restrict the enumeration of routes by onlyappending orders from the neighborhood. A route is feasible if the maximum timeallowed for one day and the maximum vehicle capacities along the route are notexceeded. Every time a full container is picked up from an ELV dismantler, it mustbe exchanged for an empty container of the same type. If this is not possible, theroute is infeasible. We make use of a recursive function implementation for thesystematic generation of routes. The RouteGenerator function describes the mainidea behind the route generation algorithm.

A sub-order is added to a route by inserting the pickup stop and the deliverystop of the sub-order in the route. Since we deal with the pickup and deliverysituation, for each possible position where the pickup stop (StopP) can be in-serted, we find the cheapest position to insert the delivery stop (StopD). TheInsertSubOrder function describes the main ideas behind the insertion of a sub-order in a route.

Although the number of routes generated is restricted by the size of the orderneighborhood, it can still be very large in some cases. Occasionally, over 2.5

Function RouteGeneratorIF ( Route empty )

RouteNeighborHood := Set of all SubOrders ENDIFFOR ( SubOrder in RouteNeighborHood AND RootOrder unplanned ) DO

InsertSubOrder( SubOrder ) UpdateRouteNeighborhood IF( RouteFeasible )THEN

WriteRouteToRouteSelectionProblem RouteGenerator

ENDIF RemoveSubOrder UpdateRouteNeighborhood

ENDFOR

Function InsertSuborder( SubOrder) FOR ( Position in Route ) DO

Insert StopP FOR ( Position in Route after Stop P ) DO

Insert StopD UpdateRoute

IF ( BestInsertion AND RouteFeasible ) THENStoreBestInsertionPosition

ENDIF Remove StopD

ENDFOR Remove StopP

ENDFORIF ( BestInsertionExists ) THEN

Insert StopD and StopP at best position UpdateRoute

ENDIF

Vehicle routing concepts in the closed-loop container network of ARN—a case study 63

million routes are generated. In that case, because of memory limitations of ourcomputers, we reduce the maximum allowed size of the neighborhood by one andrestart the route generation.

4.2 Route selection

The problem of finding the optimal combination of routes such that all orders areperformed at minimal costs is formulated as a set partitioning problem. Afterintroducing some notation, the problem is given in Eq. [3]–[5].

Parametersδso,ro = 1 if sub-order so belongs to root-order ro, 0 otherwise.aso,r = 1 if sub-order so is contained in route r, 0 otherwise.cr = denotes the costs of driving route r in euro.pr = denotes the profit or costs (negative pr) of route r as a result of the chosen

delivery locations for the orders in route r in euro.

VariablesXr=1 if route r is selected, 0 otherwise.

The route selection problem

minP

r

cr � prð Þ � Xr (3)

s:t:P

r

P

so

�so;ro � aso;rð Þ � Xr ¼ 1 8ro (4)

Xr 2 0; 1f g 8r (5)

Note thatP

so�so;ro � aso;r is either 0 or 1 by construction of the route generator

and therefore the route selection problem is a pure set partitioning problem. Toexploit the special structure of the set partitioning problem we make use of a specialset partitioning solver, rather than more generic mixed-integer linear programmingsolvers such as Cplex (http://www.ilog.com). We use the solver developed by VanKrieken et al. (2004). This solver uses Lagrangean relaxation and dual heuristics todetermine the lower bound and branch and bound for finding the optimal solution.Furthermore, several problem reduction techniques are used to reduce the numberof variables and constraints in the problem (Van Krieken et al. 2003). The solver isvery effective at solving the set partitioning instances under consideration, al-though the number of variables can become very large. Problems with over amillion variables are solved in a couple of minutes on a normal desktop computer.

64 H. M. le Blanc et al.

5 Structure of the analysis

5.1 Simulation

We use a simulation model to analyze the performance of the system. Thetransportation orders from ELV-dismantlers are generated following empiricaldistributions. To obtain representative results, each simulation run consists of 10replications of one year. In the simulation, the operational vehicle routing problemis solved twice a week for a planning horizon of three workdays. This means thatover 1000 set partitioning problems are generated and solved per simulation run.

Orders generated during a certain collection period are planned and executedthe next planning period. For containers of tires brought to the depot, the orders forshipping the containers to the recycler are also issued at the beginning of the nextplanning period. In this way transportation orders are fixed at the beginning of aplanning period.

5.2 Data and scenarios

The scenarios are constructed in cooperation with the logistic experts of ARN andin cooperation with the logistic service providers hired by ARN. Distances anddriving times used in the analysis were obtained from Evo-IT (http://www.evo-it.nl).The cost figures used were obtained from the NEA (2004), which is an authorityon traffic and transportation issues in the Netherlands. We use cost prices ratherthan the commercial rates of individual LSPs. The data used for simulating theprocesses at the ELV-dismantlers are empirical data available in the corporatedatabases of ARN. A detailed description of these data can be found in Schreurs(2004).

Scenarios are defined along three dimensions:

– The lifting mechanisms used by the LSPs:

– The current situation: two different lifting mechanisms are used.– The standardized situation: all LSPs use the same lifting mechanism.

– The assignment of transportation orders to the logistics service providers

– Current fixed assignment: ELV dismantlers are assigned to LSPs andrecyclers on the basis of province boundaries.

– Optimized fixed assignment: ELV-dismantlers are assigned to the closestLSP/recycler based on a distance criterion.

– Central planning: no fixed assignment exists; the LSP with the best com-bination possibilities executes the transportation order.

– The allowed routes for containers of tires:

– No direct shipment: all tire containers pass the depot.– Direct shipment: this is allowed if it is advantageous to ship tire containers

directly to a tire recycler instead of the depot.

Vehicle routing concepts in the closed-loop container network of ARN—a case study 65

Figure 6 shows six scenarios defined along the last two dimensions and theirscenario IDs. These six scenarios can be applied to both lifting mechanisms, thefirst dimension, resulting in a total of twelve. Scenario Cur-indirect is our referencescenario and corresponds to the current situation of ARN.

The current assignment of ELV-dismantlers to depots and recyclers is based onprovince boundaries, for historic reasons. In many cases, this assignment is farfrom efficient, since provinces can have irregular shapes. We resolve this by simplyassigning each ELV-dismantler to the nearest depot with the proper lifting mech-anism. In the central planning scenario, the effect of a fixed assignment is analyzedby letting go of this restriction altogether and using dynamic planning on a centrallevel.

Currently, nearly all tire containers are transported to the recycler via a depot,since the container must be weighed at the depot. Nowadays, recyclers also haveaccurate weighing facilities for trucks, making a stop at the depot no longernecessary. Direct shipment of containers filled with tires is possible as long as thedate of delivery is communicated.

6 Results

6.1 Current logistic network

The results for the current logistic network with LSPs having different types oflifting mechanisms are presented in Table 3. For reasons of confidentiality, the costfigures have been indexed. A comparison of the various scenarios for the yearlyindexed costs is also presented in Fig. 7.

Allowing the logistic service providers to ship tire containers directly fromELV-dismantlers to recyclers, results in cost savings ranging from 6.3% to 9.1%,depending on the way in which ELV-dismantlers are assigned to LSPs. The averageroute length increases both in time and distance, since it is more attractive to make a

Allow direct shipmentsCurrent assignment

Allow direct shipmentsOptimized assignment

Allow direct shipmentsCentral planning

Only indirect shipmentsCurrent assignment

Only indirect shipmentsOptimized assignment

Only indirect shipmentsCentral planning

Scenarios

As

sig

nm

en

t o

f o

rde

rs

Types of shipment allowed

Cur-direct

Opt-direct

CP-direct

Cur-indirect

Opt-indirect

CP-indirect

Fig. 6 An overview of the scenarios

66 H. M. le Blanc et al.

small detour to drop tire containers at a tire recycler rather than bring them first tothe depot and then to the recycler. This phenomenon is responsible for the drasticdecreases in the number of routes driven, since most tire containers are transportedonly once. Implementation of direct shipment is fairly easy and only requires somefurther arrangements with the recyclers.

Optimizing the assignment of ELV-dismantlers to depots and recyclers resultsin cost decreases ranging from 4.4% to 4.7%. This effect is small, since the di-

Table 3 Results for the current network with restrictions on the lifting mechanisms (Case 1)

Scenario ID Cur-indirect

Opt-indirect

CP-indirect Cur-direct

Opt-direct

CP-direct

Assignment Fixed,current

Fixed,optimized

Free, centralplanning

Fixed,current

Fixed,optimized

Free,centralplanning

Type of shipmentsfor tires

Onlyindirect

Onlyindirect

Onlyindirect

Allowdirect

Allowdirect

Allowdirect

Average costs peryear (indexed)

100 95.3 94.8 93.4 89.3 86.1

Average distance peryear (km)

505,779 471,610 467,188 483,092 458,972 433,735

Average number ofroutes per year

2,887 2,906 2,907 2,346 2,336 2,226

Average number ofcontainers per route

2.45 2.44 2.44 2.39 2.32 2.42

Average route distance(km)

175.2 162.3 160.7 205.9 196.4 194.8

Average route duration(min)

291.0 277.6 276.1 331.3 319.7 325.4

Average driving timeper route (min)

177.1 164.3 162.8 208.7 198.4 198.2

Average load andunloadtime per route

114.0 113.3 113.3 122.6 121.3 127.1

Fig. 7 Comparison of scenarios with current and standardized lifting mechanism

Vehicle routing concepts in the closed-loop container network of ARN—a case study 67

versity in container lifting mechanisms allows little freedom for optimization. It isfairly easy to change to another fixed assignment: it merely requires renegotiationof contracts with LSPs.

Compared to the optimal fixed assignment, the extra savings of dynamicallocation by central planning are limited, ranging from 0.6% to 3.6%. Thesemarginal cost savings are not offset by the changes in the planning and controlmechanisms to implement dynamic assignment.

6.2 Network with uniform lifting mechanism for containers

The differences in lifting mechanisms in use by logistic service providers are likelyto cause inefficiencies. ARN is lobbying for standardizing container liftingmechanisms at the logistic service providers. This situation is compared to thecurrent situation in Table 4. Figure 7 shows the yearly indexed costs of the variousscenarios for the current situation as well as for uniform lifting mechanisms.Currently, the assignment of dismantlers to depots and recyclers takes differencesin lifting mechanisms into account. Therefore, standardization of the lifting mech-anism only makes sense when the assignment is changed. We compare the currentsituation with the optimized assignment and central planning scenarios with auniform lifting mechanism.

Table 4 Results for the current network after loosening the restrictions on the lifting mechanisms(Case 2)

Scenario ID Cur-indirect

Opt-indirect

CP-indirect Cur-direct

Opt-direct

CP-direct

Assignment Fixed,current

Fixed,optimized

Free, centralplanning

Fixed,current

Fixed,optimized

Free,centralplanning

Type of shipments for tires Onlyindirect

Onlyindirect

Only indirect Allowdirect

Allowdirect

Allowdirect

Average costs per year(indexed)

100 87.2 86.9 93.4 81.6 80.8

Average distance per year(km)

505,779 411,893 408,954 483,092 402,125 394,886

Average number of routesper year

2,887 2,891 2,876 2,346 2,254 2,280

Average number of con-tainers per route

2.45 2.45 2.47 2.39 2.39 2.36

Average routedistance (km)

175.2 142.5 142.2 205.9 178.4 173.2

Average routeduration (min)

291.0 258.8 259.4 331.3 306.6 301.1

Average driving time perroute (min)

177.1 145.1 145.0 208.7 181.4 177.2

Average load andunloadtime per route

114.0 113.7 114.4 122.6 125.1 123.9

68 H. M. le Blanc et al.

Using optimal fixed assignment, the cost savings of standardizing the liftingmechanism are about 8.7% when we allow direct shipments. If direct shipments arenot allowed the cost savings are 8.5%.

The cost savings of standardizing the lifting mechanism in the case of centraldynamic planning are 8.3% when direct shipment is not allowed and 6.1% whendirect shipment is allowed. Given standardized lifting mechanisms, the costsavings of dynamic central planning over optimized fixed assignment are less than1%, whether we allow direct shipment or not, which does not offset the costs of theorganizational changes. Standardizing the lifting mechanism is comparable withincreasing the network density for the LSPs. Improving the combination pos-sibilities in a dense network has a marginal effect on the costs since, in a densenetwork, there are already abundant combination possibilities. These results oncentral planning are supported by the findings of Cruijssen and Salomon (2004),who showed that the benefits of central planning are limited when orders are largecompared to the vehicle capacity. Moreover, our orders are not randomly assignedto depots, but on the basis of province boundaries. Although, as we have seen,province boundaries are far from optimal, they still have some logic and are muchbetter than random assignment as was initially the case in Cruijssen and Salomon(2004).

When we optimize the assignment of recyclers to LSPs, standardizing thelifting mechanism results in considerable cost savings that justify the necessaryinvestment to implement this in the chain of ARN.

7 Conclusions and outlook

In this paper we have described a real-life project in optimizing the logistic networkfor containers with materials from end-of-life vehicles. The underlying vehiclerouting model is a unique multi-depot pickup and delivery model with alternativedelivery locations. The heuristic we used is based on generating a set of promisingroutes and selecting the optimal combination of routes by solving a set partitioningproblem.

The reasons for the limited research on this type of problems probably lies inthe fact that it is considered a typical reverse logistics problem where waste or coresfor recycling are collected, bundled and brought to a central recovery center. We arenot aware of forward logistic problems with similar characteristics. Although wedeveloped a new heuristic and the heuristics described in the literature stem fromproblem instances that are typically product recovery or waste disposal networks,we do not have the impression that the mathematical techniques differ. Relatingthis project to earlier projects in the same recycling network, we conjecture that,although logistic concepts differ from forward logistics, the mathematical tech-niques and models in this network are not fundamentally different.

From a business point of view, we analyzed the consequences of a betterassignment of waste generators to logistics service providers and of routing de-cisions made by central planning. Furthermore, we analyzed the influence of apolicy that did not allow the direct shipment from waste generator sites to recyclingfacilities and the effects of the different lifting mechanisms used for containers.

With respect to the assignment of recyclers to logistics service providers, werecommend changing the current fixed assignment, which is based on province

Vehicle routing concepts in the closed-loop container network of ARN—a case study 69

boundaries, to the optimal fixed assignment. Considerable effort would be in-volved in implementation of the dynamic assignment option, while the additionalsavings over the optimal fixed assignment are limited. Since the study shows thatallowing direct shipment will result in cost savings and the organizational burden isnot very large, we recommend allowing direct shipment of tires to recyclers. Withrespect to the lifting mechanism, the study has shown that standardization willresult in significant cost savings, making it worth the effort to standardize thelifting mechanism in the ARN network. The total percentage cost savings of therecommended new system with standardized lifting mechanism, the option ofdirect shipments and the optimal fixed assignment are over 18% compared to thecurrent system.

Since cost reductions in closed-loop supply chains for EOL products arecrucial, they can make the difference between recycling for profit or for loss. In thelatter case, OEMs will not recycle as long as they are not forced to do so bylegislation. The best way towards a sustainable society is through business moti-vations. Since we have only just started to set up and design product recoverynetworks, there are great opportunities for operations research to assist by offeringadvanced planning systems from the operational to the strategic level.

References

Agarwal Y, Mathur K, Salkin HM (1989) A set-partitioning-based exact algorithm for the vehiclerouting problem. Networks 19:731–749

Archetti C, Speranza MG (2004) Vehicle routing in the 1-skip collection problem. J Oper Res Soc55:717–727

ACEA, Association des Constructeurs Européens d’ Automobiles (2004) Country report chartson end-of-life vehicle treatment status, February 2004. Downloadable from: http://www.acea.be/

Beullens P (2001) Location, process selection and vehicle routing models for reverse logistics.PhD thesis, University of Leuven, Belgium

Bodin L, Golden B, Assad A, Ball M (1983) Routing and scheduling of vehicles and crews: thestate of the art. Comput Oper Res 10:63–211

Bodin L, Mingozzi A, Baldacci R (2000) The rollon-rolloff vehicle routing problem. Transp Sci43(3):271–288

Bumstead J, Cannons K (2002) From 4PL to Managed Supply Chain Operations. Logist TranspFocus 4(4):19–25

Cruijssen F, Salomon M (2004) Empirical study: order sharing between transportation companiesmay result in cost reductions between 5 to 15 percent. Center Discussion Paper 80–2004

De Meulemeester L, Laporte G, Louveaux FV, Semet F (1997) Optimal sequencing of skipcollections and deliveries. Journal of Operational Research Society 48:57–64

Dethloff J (2001) Vehicle routing and reverse logistics: the vehicle routing problem withsimultaneous delivery and pick-up. OR Spectrum 23:79–96

Directive 2000/53/EC of the European parliament and of the council of 18 September 2000 onend-of-life vehicles. Official Journal of the European Communities, L 269/34

Fleuren HA (1988) A computational study of the set partitioning approach for vehicle routing andscheduling problems. Dissertation, University of Twente, The Netherlands

Krikke HR, Le Blanc HM, Van de Velde SL (2004) Product modularity and the design of closed-loop supply chains. Calif Manage Rev 46(2):23–39

Laporte G, Gendreau M, Potvin JY, Semet F (2000) Classical and modern heuristics for vehiclerouting problem. Int Trans Oper Res 7:285–300

Le Blanc HM, Fleuren HA, Krikke HR (2004) Redesign of a recycling system for LPG-tanks. ORSpectrum 26:283–304

NEA (2004) Kostencalculaties in het beroepsgoederenvervoer over de weg, prijspeil 1-1-2004.Rijswijk, The Netherlands

70 H. M. le Blanc et al.

Püchert H, Walter A, Conradt P, Rentz O (1994) Autorecycling, Demontage und Verwertung.Wirtschaftliche Aspekte, Logistik und Organisation. Economica Verlag, Bonn, Germany

Schreurs RP (2004) Voorspelbaarheid van de inzameling van materialen afkomstig vanautowrakken en de impact op de distributieplanning. Master thesis, Tilburg University, TheNetherlands

Spicer AJ, Johnson MR (2004) Third-party demanufacturing as a solution for extended producerresponsibility. J Clean Prod 12:37–45

Toth P, Vigo D (2002) The vehicle routing problem. Society for Industrial and AppliedMathematics, SIAM Monographs on Discrete Mathematics and Applications

Van Burik AMC (1998) Retourstroomproblematiek van materialen afkomstig uit autowrakken.In: Van Goor AR, Flapper SDP, Clement C (eds) Handboek reverse logistics. SamsonBedrijfsinformatie, Alphen aan den Rijn, The Netherlands, F3600 pp 1–12

Van Krieken MGC, Fleuren HA, Peeters MJP (2003) Problem reduction in set partitioningproblems. Center Discussion Papers 2003–80

Van Krieken MGC, Fleuren HA, Peeters MJP (2004) A Lagrangean relaxation based algorithmfor solving set partitioning problems. Center Discussion Papers 2004–44

Vehicle routing concepts in the closed-loop container network of ARN—a case study 71

  • Vehicle routing concepts in the closed-loop container network of ARN—a case study
    • Abstract
      • Introduction
        • Developments in end-of-life vehicle recycling
        • Outline of the paper
      • Problem description and background
        • Case study
        • The 2-container collection problem
      • Literature
      • Description of the heuristic
        • Route generation
          • Root and sub-orders
          • Neighborhoods
          • Outline of the route generation algorithm
        • Route selection
      • Structure of the analysis
        • Simulation
        • Data and scenarios
      • Results
        • Current logistic network
        • Network with uniform lifting mechanism for containers
      • Conclusions and outlook
      • References

<< /ASCII85EncodePages false /AllowTransparency false /AutoPositionEPSFiles true /AutoRotatePages /None /Binding /Left /CalGrayProfile (None) /CalRGBProfile (sRGB IEC61966-2.1) /CalCMYKProfile (ISO Coated) /sRGBProfile (sRGB IEC61966-2.1) /CannotEmbedFontPolicy /Error /CompatibilityLevel 1.3 /CompressObjects /Off /CompressPages true /ConvertImagesToIndexed true /PassThroughJPEGImages true /CreateJDFFile false /CreateJobTicket false /DefaultRenderingIntent /Perceptual /DetectBlends true /ColorConversionStrategy /sRGB /DoThumbnails true /EmbedAllFonts true /EmbedJobOptions true /DSCReportingLevel 0 /EmitDSCWarnings false /EndPage -1 /ImageMemory 524288 /LockDistillerParams true /MaxSubsetPct 100 /Optimize true /OPM 1 /ParseDSCComments true /ParseDSCCommentsForDocInfo true /PreserveCopyPage true /PreserveEPSInfo true /PreserveHalftoneInfo false /PreserveOPIComments false /PreserveOverprintSettings true /StartPage 1 /SubsetFonts false /TransferFunctionInfo /Apply /UCRandBGInfo /Preserve /UsePrologue false /ColorSettingsFile () /AlwaysEmbed [ true /AardvarkPSMT /AceBinghamSH /AddisonLibbySH /AGaramond-Italic /AGaramond-Regular /AkbarPlain /Albertus-Bold /AlbertusExtraBold-Regular /AlbertusMedium-Italic /AlbertusMedium-Regular /AlfonsoWhiteheadSH /Algerian /AllegroBT-Regular /AmarilloUSAF /AmazoneBT-Regular /AmeliaBT-Regular /AmerigoBT-BoldA /AmerTypewriterITCbyBT-Medium /AndaleMono /AndyMacarthurSH /Animals /AnneBoleynSH /Annifont /AntiqueOlive-Bold /AntiqueOliveCompact-Regular /AntiqueOlive-Italic /AntiqueOlive-Regular /AntonioMountbattenSH /ArabiaPSMT /AradLevelVI /ArchitecturePlain /Arial-Black /Arial-BlackItalic /Arial-BoldItalicMT /Arial-BoldMT /Arial-ItalicMT /ArialMT /ArialMTBlack-Regular /ArialNarrow /ArialNarrow-Bold /ArialNarrow-BoldItalic /ArialNarrow-Italic /ArialRoundedMTBold /ArialUnicodeLight /ArialUnicodeLight-Bold /ArialUnicodeLight-BoldItalic /ArialUnicodeLight-Italic /ArrowsAPlentySH /ArrusBT-Bold /ArrusBT-BoldItalic /ArrusBT-Italic /ArrusBT-Roman /Asiana /AssadSadatSH /AvalonPSMT /AvantGardeITCbyBT-Book /AvantGardeITCbyBT-BookOblique /AvantGardeITCbyBT-Demi /AvantGardeITCbyBT-DemiOblique /AvantGardeITCbyBT-Medium /AvantGardeITCbyBT-MediumOblique /BankGothicBT-Light /BankGothicBT-Medium /Baskerville-Bold /Baskerville-Normal /Baskerville-Normal-Italic /BaskOldFace /Bauhaus93 /Bavand /BazookaRegular /BeauTerrySH /BECROSS /BedrockPlain /BeeskneesITC /BellMT /BellMTBold /BellMTItalic /BenguiatITCbyBT-Bold /BenguiatITCbyBT-BoldItalic /BenguiatITCbyBT-Book /BenguiatITCbyBT-BookItalic /BennieGoetheSH /BerlinSansFB-Bold /BerlinSansFBDemi-Bold /BerlinSansFB-Reg /BernardMT-Condensed /BernhardBoldCondensedBT-Regular /BernhardFashionBT-Regular /BernhardModernBT-Bold /BernhardModernBT-BoldItalic /BernhardModernBT-Italic /BernhardModernBT-Roman /Bethel /BibiGodivaSH /BibiNehruSH /BKenwood-Regular /BlackadderITC-Regular /BlondieBurtonSH /BodoniBlack-Regular /Bodoni-Bold /Bodoni-BoldItalic /BodoniBT-Bold /BodoniBT-BoldItalic /BodoniBT-Italic /BodoniBT-Roman /Bodoni-Italic /BodoniMTPosterCompressed /Bodoni-Regular /BookAntiqua /BookAntiqua-Bold /BookAntiqua-BoldItalic /BookAntiqua-Italic /BookmanOldStyle /BookmanOldStyle-Bold /BookmanOldStyle-BoldItalic /BookmanOldStyle-Italic /BookshelfSymbolFive /BookshelfSymbolFour /BookshelfSymbolOne-Regular /BookshelfSymbolThree-Regular /BookshelfSymbolTwo-Regular /BookwomanDemiItalicSH /BookwomanDemiSH /BookwomanExptLightSH /BookwomanLightItalicSH /BookwomanLightSH /BookwomanMonoLightSH /BookwomanSwashDemiSH /BookwomanSwashLightSH /BoulderRegular /BradleyHandITC /Braggadocio /BrailleSH /BRectangular /BremenBT-Bold /BritannicBold /Broadview /Broadway /BroadwayBT-Regular /BRubber /Brush445BT-Regular /BrushScriptMT /BSorbonna /BStranger /BTriumph /BuckyMerlinSH /BusoramaITCbyBT-Medium /Caesar /CalifornianFB-Bold /CalifornianFB-Italic /CalifornianFB-Reg /CalisMTBol /CalistoMT /CalistoMT-Italic /CalligrapherRegular /CameronStendahlSH /Candy /CandyCaneUnregistered /CankerSore /CarlTellerSH /CarrieCattSH /CaslonOpenfaceBT-Regular /CassTaylorSH /CDOT /Centaur /CenturyGothic /CenturyGothic-Bold /CenturyGothic-BoldItalic /CenturyGothic-Italic /CenturyOldStyle-BoldItalic /CenturySchoolbook /CenturySchoolbook-Bold /CenturySchoolbook-BoldItalic /CenturySchoolbook-Italic /Cezanne /CGOmega-Bold /CGOmega-BoldItalic /CGOmega-Italic /CGOmega-Regular /CGTimes-Bold /CGTimes-BoldItalic /CGTimes-Italic /CGTimes-Regular /Charting /ChartreuseParsonsSH /ChaseCallasSH /ChasThirdSH /ChaucerRegular /CheltenhamITCbyBT-Bold /CheltenhamITCbyBT-BoldItalic /CheltenhamITCbyBT-Book /CheltenhamITCbyBT-BookItalic /ChildBonaparteSH /Chiller-Regular /ChuckWarrenChiselSH /ChuckWarrenDesignSH /CityBlueprint /Clarendon-Bold /Clarendon-Book /ClarendonCondensedBold /ClarendonCondensed-Bold /ClarendonExtended-Bold /ClassicalGaramondBT-Bold /ClassicalGaramondBT-BoldItalic /ClassicalGaramondBT-Italic /ClassicalGaramondBT-Roman /ClaudeCaesarSH /CLI /Clocks /ClosetoMe /CluKennedySH /CMBX10 /CMBX5 /CMBX7 /CMEX10 /CMMI10 /CMMI5 /CMMI7 /CMMIB10 /CMR10 /CMR5 /CMR7 /CMSL10 /CMSY10 /CMSY5 /CMSY7 /CMTI10 /CMTT10 /CoffeeCamusInitialsSH /ColetteColeridgeSH /ColonnaMT /ComicSansMS /ComicSansMS-Bold /CommercialPiBT-Regular /CommercialScriptBT-Regular /Complex /CooperBlack /CooperBT-BlackHeadline /CooperBT-BlackItalic /CooperBT-Bold /CooperBT-BoldItalic /CooperBT-Medium /CooperBT-MediumItalic /CooperPlanck2LightSH /CooperPlanck4SH /CooperPlanck6BoldSH /CopperplateGothicBT-Bold /CopperplateGothicBT-Roman /CopperplateGothicBT-RomanCond /CopticLS /Cornerstone /Coronet /CoronetItalic /Cotillion /CountryBlueprint /CourierNewPS-BoldItalicMT /CourierNewPS-BoldMT /CourierNewPS-ItalicMT /CourierNewPSMT /CSSubscript /CSSubscriptBold /CSSubscriptItalic /CSSuperscript /CSSuperscriptBold /Cuckoo /CurlzMT /CybilListzSH /CzarBold /CzarBoldItalic /CzarItalic /CzarNormal /DauphinPlain /DawnCastleBold /DawnCastlePlain /Dekker /DellaRobbiaBT-Bold /DellaRobbiaBT-Roman /Denmark /Desdemona /Diploma /DizzyDomingoSH /DizzyFeiningerSH /DocTermanBoldSH /DodgenburnA /DodoCasalsSH /DodoDiogenesSH /DomCasualBT-Regular /Durian-Republik /Dutch801BT-Bold /Dutch801BT-BoldItalic /Dutch801BT-ExtraBold /Dutch801BT-Italic /Dutch801BT-Roman /EBT's-cmbx10 /EBT's-cmex10 /EBT's-cmmi10 /EBT's-cmmi5 /EBT's-cmmi7 /EBT's-cmr10 /EBT's-cmr5 /EBT's-cmr7 /EBT's-cmsy10 /EBT's-cmsy5 /EBT's-cmsy7 /EdithDaySH /Elephant-Italic /Elephant-Regular /EmGravesSH /EngelEinsteinSH /English111VivaceBT-Regular /English157BT-Regular /EngraversGothicBT-Regular /EngraversOldEnglishBT-Bold /EngraversOldEnglishBT-Regular /EngraversRomanBT-Bold /EngraversRomanBT-Regular /EnviroD /ErasITC-Bold /ErasITC-Demi /ErasITC-Light /ErasITC-Medium /ErasITC-Ultra /ErnestBlochSH /Euclid /Euclid-Bold /Euclid-BoldItalic /EuclidExtra /EuclidExtra-Bold /EuclidFraktur /EuclidFraktur-Bold /Euclid-Italic /EuclidMathOne /EuclidMathOne-Bold /EuclidMathTwo /EuclidMathTwo-Bold /EuclidSymbol /EuclidSymbol-Bold /EuclidSymbol-BoldItalic /EuclidSymbol-Italic /EuroRoman /EuroRomanOblique /ExxPresleySH /FencesPlain /Fences-Regular /FifthAvenue /FigurineCrrCB /FigurineCrrCBBold /FigurineCrrCBBoldItalic /FigurineCrrCBItalic /FigurineTmsCB /FigurineTmsCBBold /FigurineTmsCBBoldItalic /FigurineTmsCBItalic /FillmoreRegular /Fitzgerald /Flareserif821BT-Roman /FleurFordSH /Fontdinerdotcom /FontdinerdotcomSparkly /FootlightMTLight /ForefrontBookObliqueSH /ForefrontBookSH /ForefrontDemiObliqueSH /ForefrontDemiSH /Fortress /FractionsAPlentySH /FrakturPlain /Franciscan /FranklinGothic-Medium /FranklinGothic-MediumItalic /FranklinUnic /FredFlahertySH /Freehand575BT-RegularB /Freehand591BT-RegularA /FreestyleScript-Regular /Frutiger-Roman /FTPMultinational /FTPMultinational-Bold /FujiyamaPSMT /FuturaBlackBT-Regular /FuturaBT-Bold /FuturaBT-BoldCondensed /FuturaBT-BoldItalic /FuturaBT-Book /FuturaBT-BookItalic /FuturaBT-ExtraBlack /FuturaBT-ExtraBlackCondensed /FuturaBT-ExtraBlackCondItalic /FuturaBT-ExtraBlackItalic /FuturaBT-Light /FuturaBT-LightItalic /FuturaBT-Medium /FuturaBT-MediumCondensed /FuturaBT-MediumItalic /GabbyGauguinSH /GalliardITCbyBT-Bold /GalliardITCbyBT-BoldItalic /GalliardITCbyBT-Italic /GalliardITCbyBT-Roman /Garamond /Garamond-Antiqua /Garamond-Bold /Garamond-Halbfett /Garamond-Italic /Garamond-Kursiv /Garamond-KursivHalbfett /Garcia /GarryMondrian3LightItalicSH /GarryMondrian3LightSH /GarryMondrian4BookItalicSH /GarryMondrian4BookSH /GarryMondrian5SBldItalicSH /GarryMondrian5SBldSH /GarryMondrian6BoldItalicSH /GarryMondrian6BoldSH /GarryMondrian7ExtraBoldSH /GarryMondrian8UltraSH /GarryMondrianCond3LightSH /GarryMondrianCond4BookSH /GarryMondrianCond5SBldSH /GarryMondrianCond6BoldSH /GarryMondrianCond7ExtraBoldSH /GarryMondrianCond8UltraSH /GarryMondrianExpt3LightSH /GarryMondrianExpt4BookSH /GarryMondrianExpt5SBldSH /GarryMondrianExpt6BoldSH /GarryMondrianSwashSH /Gaslight /GatineauPSMT /GDT /Geometric231BT-BoldC /Geometric231BT-LightC /Geometric231BT-RomanC /GeometricSlab703BT-Bold /GeometricSlab703BT-BoldCond /GeometricSlab703BT-BoldItalic /GeometricSlab703BT-Light /GeometricSlab703BT-LightItalic /GeometricSlab703BT-Medium /GeometricSlab703BT-MediumCond /GeometricSlab703BT-MediumItalic /GeometricSlab703BT-XtraBold /GeorgeMelvilleSH /Georgia /Georgia-Bold /Georgia-BoldItalic /Georgia-Italic /Gigi-Regular /GillSansBC /GillSans-Bold /GillSans-BoldItalic /GillSansCondensed-Bold /GillSansCondensed-Regular /GillSansExtraBold-Regular /GillSans-Italic /GillSansLight-Italic /GillSansLight-Regular /GillSans-Regular /GoldMinePlain /Gonzo /GothicE /GothicG /GothicI /GoudyHandtooledBT-Regular /GoudyOldStyle-Bold /GoudyOldStyle-BoldItalic /GoudyOldStyleBT-Bold /GoudyOldStyleBT-BoldItalic /GoudyOldStyleBT-Italic /GoudyOldStyleBT-Roman /GoudyOldStyleExtrabold-Regular /GoudyOldStyle-Italic /GoudyOldStyle-Regular /GoudySansITCbyBT-Bold /GoudySansITCbyBT-BoldItalic /GoudySansITCbyBT-Medium /GoudySansITCbyBT-MediumItalic /GraceAdonisSH /Graeca /Graeca-Bold /Graeca-BoldItalic /Graeca-Italic /Graphos-Bold /Graphos-BoldItalic /Graphos-Italic /Graphos-Regular /GreekC /GreekS /GreekSans /GreekSans-Bold /GreekSans-BoldOblique /GreekSans-Oblique /Griffin /GrungeUpdate /Haettenschweiler /HankKhrushchevSH /HarlowSolid /HarpoonPlain /Harrington /HeatherRegular /Hebraica /HeleneHissBlackSH /Helvetica /Helvetica-Bold /Helvetica-BoldOblique /Helvetica-Narrow /Helvetica-Narrow-Bold /Helvetica-Narrow-BoldOblique /Helvetica-Narrow-Oblique /Helvetica-Oblique /HenryPatrickSH /Herald /HighTowerText-Italic /HighTowerText-Reg /HogBold-HMK /HogBook-HMK /HomePlanning /HomePlanning2 /HomewardBoundPSMT /Humanist521BT-Bold /Humanist521BT-BoldCondensed /Humanist521BT-BoldItalic /Humanist521BT-Italic /Humanist521BT-Light /Humanist521BT-LightItalic /Humanist521BT-Roman /Humanist521BT-RomanCondensed /IBMPCDOS /IceAgeD /Impact /Incised901BT-Bold /Incised901BT-Light /Incised901BT-Roman /Industrial736BT-Italic /Informal011BT-Roman /InformalRoman-Regular /Intrepid /IntrepidBold /IntrepidOblique /Invitation /IPAExtras /IPAExtras-Bold /IPAHighLow /IPAHighLow-Bold /IPAKiel /IPAKiel-Bold /IPAKielSeven /IPAKielSeven-Bold /IPAsans /ISOCP /ISOCP2 /ISOCP3 /ISOCT /ISOCT2 /ISOCT3 /Italic /ItalicC /ItalicT /JesterRegular /Jokerman-Regular /JotMedium-HMK /JuiceITC-Regular /JupiterPSMT /KabelITCbyBT-Book /KabelITCbyBT-Ultra /KarlaJohnson5CursiveSH /KarlaJohnson5RegularSH /KarlaJohnson6BoldCursiveSH /KarlaJohnson6BoldSH /KarlaJohnson7ExtraBoldCursiveSH /KarlaJohnson7ExtraBoldSH /KarlKhayyamSH /Karnack /Kashmir /KaufmannBT-Bold /KaufmannBT-Regular /KeplerStd-Black /KeplerStd-BlackIt /KeplerStd-Bold /KeplerStd-BoldIt /KeplerStd-Italic /KeplerStd-Light /KeplerStd-LightIt /KeplerStd-Medium /KeplerStd-MediumIt /KeplerStd-Regular /KeplerStd-Semibold /KeplerStd-SemiboldIt /KeystrokeNormal /Kidnap /KidsPlain /Kindergarten /KinoMT /KissMeKissMeKissMe /KoalaPSMT /KorinnaITCbyBT-Bold /KorinnaITCbyBT-KursivBold /KorinnaITCbyBT-KursivRegular /KorinnaITCbyBT-Regular /KristenITC-Regular /Kristin /KunstlerScript /KyotoSong /LainieDaySH /LandscapePlanning /Lapidary333BT-Bold /Lapidary333BT-BoldItalic /Lapidary333BT-Italic /Lapidary333BT-Roman /LatinoPal3LightItalicSH /LatinoPal3LightSH /LatinoPal4ItalicSH /LatinoPal4RomanSH /LatinoPal5DemiItalicSH /LatinoPal5DemiSH /LatinoPal6BoldItalicSH /LatinoPal6BoldSH /LatinoPal7ExtraBoldSH /LatinoPal8BlackSH /LatinoPalCond4RomanSH /LatinoPalCond5DemiSH /LatinoPalCond6BoldSH /LatinoPalExptRomanSH /LatinoPalSwashSH /LatinWidD /LatinWide /LeeToscanini3LightSH /LeeToscanini5RegularSH /LeeToscanini7BoldSH /LeeToscanini9BlackSH /LeeToscaniniInlineSH /LetterGothic12PitchBT-Bold /LetterGothic12PitchBT-BoldItal /LetterGothic12PitchBT-Italic /LetterGothic12PitchBT-Roman /LetterGothic-Bold /LetterGothic-BoldItalic /LetterGothic-Italic /LetterGothicMT /LetterGothicMT-Bold /LetterGothicMT-BoldOblique /LetterGothicMT-Oblique /LetterGothic-Regular /LibrarianRegular /LinusPSMT /Lithograph-Bold /LithographLight /LongIsland /LubalinGraphMdITCTT /LucidaBright /LucidaBright-Demi /LucidaBright-DemiItalic /LucidaBright-Italic /LucidaCalligraphy-Italic /LucidaConsole /LucidaFax /LucidaFax-Demi /LucidaFax-DemiItalic /LucidaFax-Italic /LucidaHandwriting-Italic /LucidaSans-Typewriter /LucidaSans-TypewriterBold /LucidaSansUnicode /LydianCursiveBT-Regular /Magneto-Bold /Map-Symbols /MarcusHobbesSH /Mariah /Marigold /MaritaMedium-HMK /MaritaScript-HMK /Market /MartinMaxxieSH /MathTypeMed /MatisseITC-Regular /MaturaMTScriptCapitals /MaudeMeadSH /MemorandumPSMT /Metro /Metrostyle-Bold /MetrostyleExtended-Bold /MetrostyleExtended-Regular /Metrostyle-Regular /MicrogrammaD-BoldExte /MicrosoftSansSerif /MikePicassoSH /MiniPicsLilEdibles /MiniPicsLilFolks /MiniPicsLilStuff /MischstabPopanz /MisterEarlBT-Regular /Mistral /ModerneDemi /ModerneDemiOblique /ModerneOblique /ModerneRegular /Modern-Regular /MonaLisaRecutITC-Normal /Monospace821BT-Bold /Monospace821BT-BoldItalic /Monospace821BT-Italic /Monospace821BT-Roman /Monotxt /MonotypeCorsiva /MonotypeSorts /MorrisonMedium /MorseCode /MotorPSMT /MSAM10 /MSLineDrawPSMT /MS-Mincho /MSOutlook /MSReference1 /MSReference2 /MTEX /MTEXB /MTEXH /MT-Extra /MTGU /MTGUB /MTLS /MTLSB /MTMI /MTMIB /MTMIH /MTMS /MTMSB /MTMUB /MTMUH /MTSY /MTSYB /MTSYH /MT-Symbol /MTSYN /Music /MysticalPSMT /NagHammadiLS /NealCurieRuledSH /NealCurieSH /NebraskaPSMT /Neuropol-Medium /NevisonCasD /NewMilleniumSchlbkBoldItalicSH /NewMilleniumSchlbkBoldSH /NewMilleniumSchlbkExptSH /NewMilleniumSchlbkItalicSH /NewMilleniumSchlbkRomanSH /News702BT-Bold /News702BT-Italic /News702BT-Roman /Newton /NewZuricaBold /NewZuricaItalic /NewZuricaRegular /NiagaraEngraved-Reg /NiagaraSolid-Reg /NigelSadeSH /Nirvana /NuptialBT-Regular /OCRAbyBT-Regular /OfficePlanning /OldCentury /OldEnglishTextMT /Onyx /OnyxBT-Regular /OpenSymbol /OttawaPSMT /OttoMasonSH /OzHandicraftBT-Roman /OzzieBlack-Italic /OzzieBlack-Regular /PalatiaBold /PalatiaItalic /PalatiaRegular /PalmSpringsPSMT /Pamela /PanRoman /ParadisePSMT /ParagonPSMT /ParamountBold /ParamountItalic /ParamountRegular /Parchment-Regular /ParisianBT-Regular /ParkAvenueBT-Regular /Patrick /Patriot /PaulPutnamSH /PcEncodingLowerSH /PcEncodingSH /Pegasus /PenguinLightPSMT /PennSilvaSH /Percival /PerfectRegular /Pfn2BlackItalic /Phantom /PhilSimmonsSH /Pickwick /PipelinePlain /Playbill /PoorRichard-Regular /Poster /PosterBodoniBT-Italic /PosterBodoniBT-Roman /Pristina-Regular /Proxy1 /Proxy2 /Proxy3 /Proxy4 /Proxy5 /Proxy6 /Proxy7 /Proxy8 /Proxy9 /Prx1 /Prx2 /Prx3 /Prx4 /Prx5 /Prx6 /Prx7 /Prx8 /Prx9 /Pythagoras /Ranegund /Ravie /Ribbon131BT-Bold /RMTMI /RMTMIB /RMTMIH /RMTMUB /RMTMUH /RobWebsterExtraBoldSH /Rockwell /Rockwell-Bold /Rockwell-ExtraBold /Rockwell-Italic /RomanC /RomanD /RomanS /RomanT /Romantic /RomanticBold /RomanticItalic /Sahara /SalTintorettoSH /SamBarberInitialsSH /SamPlimsollSH /SansSerif /SansSerifBold /SansSerifBoldOblique /SansSerifOblique /Sceptre /ScribbleRegular /ScriptC /ScriptHebrew /ScriptS /Semaphore /SerifaBT-Black /SerifaBT-Bold /SerifaBT-Italic /SerifaBT-Roman /SerifaBT-Thin /Sfn2Bold /Sfn3Italic /ShelleyAllegroBT-Regular /ShelleyVolanteBT-Regular /ShellyMarisSH /SherwoodRegular /ShlomoAleichemSH /ShotgunBT-Regular /ShowcardGothic-Reg /SignatureRegular /Signboard /SignetRoundhandATT-Italic /SignetRoundhand-Italic /SignLanguage /Signs /Simplex /SissyRomeoSH /SlimStravinskySH /SnapITC-Regular /SnellBT-Bold /Socket /Sonate /SouvenirITCbyBT-Demi /SouvenirITCbyBT-DemiItalic /SouvenirITCbyBT-Light /SouvenirITCbyBT-LightItalic /SpruceByingtonSH /SPSFont1Medium /SPSFont2Medium /SPSFont3Medium /SPSFont4Medium /SpsFont4Medium /SPSFont5Normal /SPSScript /SRegular /Staccato222BT-Regular /StageCoachRegular /StandoutRegular /StarTrekNextBT-ExtraBold /StarTrekNextPiBT-Regular /SteamerRegular /Stencil /StencilBT-Regular /Stewardson /Stonehenge /StopD /Storybook /Strict /Strider-Regular /StuyvesantBT-Regular /StylusBT /StylusRegular /SubwayRegular /SueVermeer4LightItalicSH /SueVermeer4LightSH /SueVermeer5MedItalicSH /SueVermeer5MediumSH /SueVermeer6DemiItalicSH /SueVermeer6DemiSH /SueVermeer7BoldItalicSH /SueVermeer7BoldSH /SunYatsenSH /SuperFrench /SuzanneQuillSH /Swiss721-BlackObliqueSWA /Swiss721-BlackSWA /Swiss721BT-Black /Swiss721BT-BlackCondensed /Swiss721BT-BlackCondensedItalic /Swiss721BT-BlackExtended /Swiss721BT-BlackItalic /Swiss721BT-BlackOutline /Swiss721BT-Bold /Swiss721BT-BoldCondensed /Swiss721BT-BoldCondensedItalic /Swiss721BT-BoldCondensedOutline /Swiss721BT-BoldExtended /Swiss721BT-BoldItalic /Swiss721BT-BoldOutline /Swiss721BT-Italic /Swiss721BT-ItalicCondensed /Swiss721BT-Light /Swiss721BT-LightCondensed /Swiss721BT-LightCondensedItalic /Swiss721BT-LightExtended /Swiss721BT-LightItalic /Swiss721BT-Roman /Swiss721BT-RomanCondensed /Swiss721BT-RomanExtended /Swiss721BT-Thin /Swiss721-LightObliqueSWA /Swiss721-LightSWA /Swiss911BT-ExtraCompressed /Swiss921BT-RegularA /Syastro /Symap /Symath /SymbolGreek /SymbolGreek-Bold /SymbolGreek-BoldItalic /SymbolGreek-Italic /SymbolGreekP /SymbolGreekP-Bold /SymbolGreekP-BoldItalic /SymbolGreekP-Italic /SymbolGreekPMono /SymbolMT /SymbolProportionalBT-Regular /SymbolsAPlentySH /Symeteo /Symusic /Tahoma /Tahoma-Bold /TahomaItalic /TamFlanahanSH /Technic /TechnicalItalic /TechnicalPlain /TechnicBold /TechnicLite /Tekton-Bold /Teletype /TempsExptBoldSH /TempsExptItalicSH /TempsExptRomanSH /TempsSwashSH /TempusSansITC /TessHoustonSH /TexCatlinObliqueSH /TexCatlinSH /Thrust /Times-Bold /Times-BoldItalic /Times-BoldOblique /Times-ExtraBold /TimesNewRomanMT-ExtraBold /TimesNewRomanPS-BoldItalicMT /TimesNewRomanPS-BoldMT /TimesNewRomanPS-ItalicMT /TimesNewRomanPSMT /Times-Oblique /Times-Roman /Times-Semibold /Times-SemiboldItalic /TimesUnic-Bold /TimesUnic-BoldItalic /TimesUnic-Italic /TimesUnic-Regular /TonyWhiteSH /TransCyrillic /TransCyrillic-Bold /TransCyrillic-BoldItalic /TransCyrillic-Italic /Transistor /Transitional521BT-BoldA /Transitional521BT-CursiveA /Transitional521BT-RomanA /TranslitLS /TranslitLS-Bold /TranslitLS-BoldItalic /TranslitLS-Italic /TransRoman /TransRoman-Bold /TransRoman-BoldItalic /TransRoman-Italic /TransSlavic /TransSlavic-Bold /TransSlavic-BoldItalic /TransSlavic-Italic /Trebuchet-BoldItalic /TrebuchetMS /TrebuchetMS-Bold /TrebuchetMS-Italic /TribuneBold /TribuneItalic /TribuneRegular /Tristan /TrotsLight-HMK /TrotsMedium-HMK /TubularRegular /Txt /TypoUprightBT-Regular /UmbraBT-Regular /UmbrellaPSMT /UncialLS /Unicorn /UnicornPSMT /Univers /UniversalMath1BT-Regular /Univers-Bold /Univers-BoldItalic /UniversCondensed /UniversCondensed-Bold /UniversCondensed-BoldItalic /UniversCondensed-Italic /UniversCondensed-Medium /UniversCondensed-MediumItalic /Univers-CondensedOblique /UniversExtended-Bold /UniversExtended-BoldItalic /UniversExtended-Medium /UniversExtended-MediumItalic /Univers-Italic /UniversityRomanBT-Regular /UniversLightCondensed-Italic /UniversLightCondensed-Regular /Univers-Medium /Univers-MediumItalic /URWWoodTypD /USABlackPSMT /USALightPSMT /Vagabond /Venetian301BT-Demi /Venetian301BT-DemiItalic /Venetian301BT-Italic /Venetian301BT-Roman /Verdana /Verdana-Bold /Verdana-BoldItalic /Verdana-Italic /VinerHandITC /VinetaBT-Regular /Vivaldii /VladimirScript /VoguePSMT /WaldoIconsNormalA /WaltHarringtonSH /Webdings /Weiland /WesHollidaySH /Wingdings-Regular /WP-HebrewDavid /XavierPlatoSH /YuriKaySH /ZapfChanceryITCbyBT-Bold /ZapfChanceryITCbyBT-Medium /ZapfDingbatsITCbyBT-Regular /ZapfElliptical711BT-Bold /ZapfElliptical711BT-BoldItalic /ZapfElliptical711BT-Italic /ZapfElliptical711BT-Roman /ZapfHumanist601BT-Bold /ZapfHumanist601BT-BoldItalic /ZapfHumanist601BT-Italic /ZapfHumanist601BT-Roman /ZappedChancellorMedItalicSH /ZurichBT-BlackExtended /ZurichBT-Bold /ZurichBT-BoldCondensed /ZurichBT-BoldCondensedItalic /ZurichBT-BoldItalic /ZurichBT-ExtraCondensed /ZurichBT-Italic /ZurichBT-ItalicCondensed /ZurichBT-Light /ZurichBT-LightCondensed /ZurichBT-Roman /ZurichBT-RomanCondensed /ZurichBT-RomanExtended /ZurichBT-UltraBlackExtended ] /NeverEmbed [ true ] /AntiAliasColorImages false /DownsampleColorImages true /ColorImageDownsampleType /Bicubic /ColorImageResolution 150 /ColorImageDepth -1 /ColorImageDownsampleThreshold 1.50000 /EncodeColorImages true /ColorImageFilter /DCTEncode /AutoFilterColorImages false /ColorImageAutoFilterStrategy /JPEG /ColorACSImageDict << /QFactor 0.76 /HSamples [2 1 1 2] /VSamples [2 1 1 2] >> /ColorImageDict << /QFactor 0.76 /HSamples [2 1 1 2] /VSamples [2 1 1 2] >> /JPEG2000ColorACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /JPEG2000ColorImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /AntiAliasGrayImages false /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 150 /GrayImageDepth -1 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict << /QFactor 0.76 /HSamples [2 1 1 2] /VSamples [2 1 1 2] >> /GrayImageDict << /QFactor 0.15 /HSamples [1 1 1 1] /VSamples [1 1 1 1] >> /JPEG2000GrayACSImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /JPEG2000GrayImageDict << /TileWidth 256 /TileHeight 256 /Quality 30 >> /AntiAliasMonoImages false /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 600 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict << /K -1 >> /AllowPSXObjects false /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile (None) /PDFXOutputCondition () /PDFXRegistryName (http://www.color.org?) /PDFXTrapped /False /SyntheticBoldness 1.000000 /Description << /DEU <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> /ENU <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> >>>> setdistillerparams<< /HWResolution [2400 2400] /PageSize [2834.646 2834.646]>> setpagedevice

Testimonials

VRPCasestudy.pdf
We have updated our contact contact information. Text Us Or WhatsApp Us+1-(309) 295-6991